Project Summaries

Lifescan a medical supply company

Issue

  1. Needed to convert existing forecasting data into a new corporate reporting format
  2. Multiple conversions were necessary due to last minute changes.

Result:
  • Developed an excel based VBA program that allowed account conversion in 15 minutes or less
  • Included the ability for a lower level employee to change or update the lookup tables with complete error checking
  • Provided complete documentation on how to run the program and how to analyze and correct errors in the data
  • Project completed on time and under budget

Rapid5 Networks a Telecom Equipment start-up

with a 3.5 million monthly burn rate

Issue #1

  1. Needed forecasting tools for presentation to the board
  2. At peak company had over 300 employees in five locations
Result:
  • Provided basic forecast for the board in less than a week using excel
  • Later developed sophisticated forecasting system that interlinked ten functional areas with over 30 departments with a combined budget of 4 million a month
  • Constructed a method to link all headcount and capital assets purchases to company wide milestones. These expenses would be pulled forward or pushed back using these milestones in a similar way as Hyperion Pillar
  • Board in recognition of my accomplishments awarded me five thousand additional options
Issue #2
  1. Project manager for implementation of J. D. Edwards operations and cost accounting systems

      Results:

      • Worked with consultant and effected operations departments laid out needs and wants for the inventory, purchasing, manufacturing and cost accounting systems
      • Managed the installation, training and configuration of all operations, manufacturing accounting and cost accounting systems

Cisco Systems

Issue #1

  1. Replace departed analysis and develop procedures
Results:
  • Working with new group controller developed monthly close procedures to meet Cisco's 3-day close
  • Wrote procedures for both the close and how to use Oracle General Ledger and Accounts Payable systems
Issue #2
  1. Monthly P.O. analysis took a day to a day and a half to complete each month Result:
    • Used VBA to parse and reformat an Oracle PO report
    • Using the reformatted report summarized all outstanding PO's and placed summary and analysis on single page
    • Developed sophisticated formulas to increase the functionality of the information provided using the existing input data
    • Upon completion the analysis was completed each month in less than 45 minutes

Coherent Technologies

Issue #1
  1. Employee knowledgeable in Hyperion Pillar left 3 months previously
Result:
    " Explored and documented previous configuration and made appropriate changes to meet budget/forecast deadline for new fiscal year " Trained replacement Analyst and other employees on the proper way to use Hyperion Pillar as a budget/forecasting tool

This experience in Finance and Excel could be at your disposal

Contact Me to get started:      Larry Moseley